Modelling and solving a special case of the workforce scheduling problem using Python MIP and the COIN-OR CBC solver.

Notifications You must be signed in to change notification settings

zixzeus/workforce_scheduling

 
 

Folders and files

NameName
Last commit message
Last commit date

Latest commit

 

History

11 Commits
 
 
 
 
 
 
 
 
 
 

Repository files navigation

Workforce scheduling

A special case of the workforce scheduling problem is modelled and solved using Python. The following packages are used:

  • Python-MIP for modelling the problem and solving it via the integrated COIN-OR CBC solver
  • pandas for data input and postprocessing the solution
  • plotly for visualization of the solution

Problem description

A shop is open from Monday to Saturday. The opening hours are the same for each day. For each 30 minute slot during the opening hours there exists a demand for a specific number of employees.

There exist the following sets:

In the model there are several parameters:

An employee can have a special qualification (e.g. management experience, safety training, ...).

The demand for employees with this qualification for a slot with demand is given by λ. For each employee there can be requirements for the minimum and maximum working hours he/she has to work per week. Additionaly there is a global minimum for the length of a shift: If an employee works on a day the shift has to be equal or longer than δ. For each employee and day the length of the shift can't exceed a value of Ω hours. The maximum working hours per week for an employee can be exceeded if Θ is greater than zero. In this case the employee does overtime. In contrast if Φ is greater than zero an employee can work less than the agreed minimum working hours per week. The parameter γ denotes the availablity in hours of an employee on a given day. If set to 0 the employee is not available (e.g. due to sickness, vacation, etc.).

The problem needs these decision variables:

It is clear that at most one of the z variables per employee and day can be one. If the employee works on a day his/her shift can only start once.

The mathematical formulation of the problem is:

The objective function aims to minimize the sum of slots which have an employee assigned to. Constraint (1) ensures that the demand for each slot and day is met or exceeded. With Constraint (2) it is guaranteed that as mentioned above an employee's shift can only start once per day. This is the case if he/she works at all on this day. Constraint (3) connects the z with the x variables: If an employee works in slots s and not in slot s-1, then the start of the shift has to be in slot s.

Constraints (4) - (9) are optional. By modifying the appropriate parameters in the input data which is an Excel file the user can choose to incorporate the constraints to the model or not.

Constraint (4) ensures that in each slot at least λ employees with special qualification are present. An employee can only work a maximum of Ω hours per day, see Constraint (5). The right hand side of the inequality is doubled because Ω is in hours and the slots are 30 min intervals. Constraint (6) ensures that if an employee works on a day the shift is at least δ hours long. The weekly working hours are taken into account by constraints (7) and (8): (7) makes sure that an employee can only exceed his maximum working hours per week by Θ hours (overtime). Notice that Θ can be 0. Similarly an employee has to work at least the agreed minimum working hours per week. It is possible to make minus hours in the amount of Φ hours (can be 0 too.) Constraint (9) ensures that an employee can only work on a given day if he is available. Then the length of the shift can't exceed his availability in hours.

Finally, constraints (10) and (11) define the domain of the decision variables.

Input data

Inside the excel file /data/InputData.xlsx all necessary information can be put into the following sheets:

  • Employees:

    • the names of the employees
    • whether an employee has special qualification (1) or not (0)
    • their availability on a specific day, later referred to as max_employee_WorkingTime_per_Day
    • their minimum working hours per week (min_hours_per_week)
    • their maximum working hours per week (max_hours_per_week)
  • Demand: the demand in personell for a 30 min time slot on a specific day

  • Days: the days to plan and the corresponding dates

  • Parameters (set yes if the constraint corresponding to the parameter is to be included in the model, else set no)

    • min_workingTime_per_Day corresponds to δ
    • max_workingTime_per_Day corresponds to Ω
    • minusHours_per_Week corresponds to Φ
    • overtime_per_Week corresponds to Θ
    • demand_specialQualification_per_Slot corresponds to λ

    For the last three parameters max_hours_per_week, min_hours_per_week and max_employee_WorkingTime_per_Day the corresponding values from the sheet Employees are taken as values.

  • Optimization_Parameters

    • timeInSeconds: maximum runtime in seconds (if left empty, there is no limit)
    • mipGap: maximum percentage deviation from the best node remaining in the branch and bound tree (if empty, default value of 1e-4 is used)

Solution

If a feasible solution was found, one can generate the resulting schedule as a pandas DataFrame:

plan = generateSchedule(x, z, nr_employees, nr_days, nr_slots, list_employees, days, slots, input_days)

The generated scheduled can be visualized using a plotly Gantt Chart:

gantt = getGantt(plan)

Finally, with

pio.renderers.default='browser'
gantt.show()

the Gantt chart is shown in the default browser.

One can even deploy the chart in a website. Zoomed in on a single day it looks like this:

You can see immediately that Mary and Jaden don't work on April 13th.

About

Modelling and solving a special case of the workforce scheduling problem using Python MIP and the COIN-OR CBC solver.

Resources

Stars

Watchers

Forks

Releases

No releases published

Packages

No packages published

Languages

  • Python 100.0%