fix(optimism): Node Tests #150
Triggered via pull request
January 28, 2025 01:13
Status
Cancelled
Total duration
4m 58s
Artifacts
–
integration.yml
on: pull_request
Matrix: test
integration success
3s
Annotations
3 errors and 1 warning
test / optimism
Canceling since a higher priority waiting request for 'integration-rf/test-fixes' exists
|
test / optimism
The operation was canceled.
|
integration success
Process completed with exit code 1.
|
test / optimism
Failed to save: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 1
|